A Skawen unit split into four sections, carried through a 600 × 2 000 mm door and joined again in the plant room
Factory · delivery
Plant room
2 000 mm
door 600 mm wide
1
Built and tested in the factory
Every unit is assembled, wired and run in our factory in Estonia before it leaves.
2
Split into sections
For a narrow way in, the unit is taken apart at its joints. Each section keeps its own base frame, door and label.
3
Carried through the door
Sections go in one by one: through doors, corridors, lifts or roof hatches. The smallest door so far was 600 × 2 000 mm.
4
Joined in the plant room
The sections are pushed together on their base frames and bolted, with the seal and brackets delivered with the unit.
5
Connected and started
Ducts, water and power are connected, the controller is plugged in and the unit is commissioned.