Project description
During the renovation of the swimming pool of the city of Gronau, the ventilation units were completely renewed. Since the new units for the changing room and entrance hall were given larger volumes due to new guidelines, they had to be repositioned from the basement to the roof.
Thanks to our equipment construction method, these could be placed on the roof without causing any problems and without any static changes.
The swimming pool dehumidifier had to be delivered in individual cubes, as it had to be lowered through a cellar shaft with dimensions of X * Y metres to a depth of 5 metres. The unit was then reassembled there.