Modular Delivery

Built to Get In: Units Delivered in Sections

Older buildings have narrow doors, steep stairs and small lifts. A Skawen unit can arrive whole, in sections or fully dismantled – and is joined again in your plant room. No walls opened, no crane over the roof.

Send Us Your Way In
See the Projects

600 × 2 000 mmsmallest door a Skawen unit has come through so far (Riigikogu, Tallinn)

1.40 × 1.20 mcellar shaft, units lowered 8 m in sections (Gland, Switzerland)

60–2 000 kgweight of one section, depending on the unit

–30 %weight compared with a metal casing

Whole, in Sections or Fully Dismantled

Three ways in

We decide it together with you when the unit is selected – from the drawings, the photos and the measurements of the way in.

01WholeBy crane or forkliftThe unit leaves the factory in one piece and is lifted onto the roof or set into the plant room. The fastest installation when the site has the space.

  • New buildings and rooftops
  • Factory-tested as one unit
  • Ducts and power connected on arrival

02In sectionsThrough doors, lifts and hatchesThe unit is split at its joints into cubes: filters, fans, heat recovery, coils. Each section sits on its own base frame and is carried in one by one.

  • Basements, attics and cellar shafts
  • Sections of about 60–2 000 kg
  • Pushed together and bolted inside

03Fully dismantledWhen even a section is too bigPanels, profiles and components travel separately and the unit is built in the plant room. The composite panels are light enough to carry by hand.

  • Openings down to 600 × 2 000 mm
  • Listed and historic buildings
  • Assembled by Skawen’s service team

From the Factory to Your Plant Room

Step by step

The same unit, the same factory test – only the way in changes. Watch a four-section unit go through a standard door.

Schematic drawing. Section count and sizes depend on the unit; the same works for stairs, lifts and roof hatches.

Made to Come Apart

Why it works

Sectional delivery is not an extra. It comes from how every Skawen unit is built.

01Light composite panelsAbout 30 % lighter than a metal casing. Sections can be carried, rolled and lifted with simple gear.

02A base frame under every sectionU-profile of glass-fibre reinforced plastic with lifting holes. Sections are pushed together on it and bolted.

03Joining kit in the boxBrackets, bolts and seal come with the unit. The joints are designed in from the start, not cut on site.

04Every section labelledEach section has its own door and a label showing what is behind it, so the order on site is clear.

05Factory-tested firstThe whole unit is assembled, wired and run in Estonia before it is split for transport.

06Sized for the roomSections and the whole unit are dimensioned to the plant room, shaft or roof you already have.

Old Unit Out, New Unit In – Through the Same Door

Renovation

In most renovations the old unit was lifted in before the walls were built. The new one does not need a hole in the wall or a crane over the roof.

  • No walls opened, no roof reinforced
  • The plant room keeps its size – the unit is sized to it
  • Sections come in through doors, lifts and hatches
  • Pools, schools and offices stay open longer during the works

Measure the way in once
Door and corridor widths · stairs and turns · lift cabin and door · roof hatch or shaft · floor load · photos of the route

Send Us Your Way In

Where the Way In Was the Hard Part

Projects

Pools, schools, a parliament and a basement spa. In each one the unit came in smaller than it was built.

skawen modular ref riigikoguParliament building · EstoniaRiigikogu – Estonian Parliament600 × 2 000 mmdoor into the ventilation chamberA listed building in Tallinn’s old town. The only way in was a 600 × 2 000 mm opening, so the SKW Compact 3000 Recu came in parts and was assembled in the plant room.

School and public pool · SwitzerlandCollège des Perrerets, Gland8 m downa 1.40 × 1.20 m cellar shaftTwo pool units came as single cubes, were lowered 8 m down a cellar shaft and joined below. The pool hall stayed as it was.

skawen modular ref tallinna 21 koolSchool pool · EstoniaTallinn School No. 21Fully dismantledassembled inside by SkawenNot even sections fitted into the school, so the SKW 6.3 Pool came fully dismantled and Skawen’s service team built it in the ventilation room.

Hotel pools · LuxembourgChâteau d’UrspeltTwo partsinto an existing technical roomOne SKW2 Pool unit for three pools and a jacuzzi area. It did not fit into the technical room in one piece, so it was built and delivered in two parts.

Private pool and spa · SwitzerlandZollikon private poolIn partscarried into a basementA private pool renovation. The SKW Compact 1000 was taken apart at the factory, carried into the basement and assembled on site.

More projects

  • Defence Forces site, Tapa – SKW 7.3 Recu, 12 000 m³/h, 2025. The heat exchanger came in two parts and was assembled on site.
  • Viimsi Artium – SKW 5.3 Recu, 6 500 m³/h. A new building with very little plant room: delivered flat-packed and built on site, the coils in a separate casing.

Before You Plan the Delivery

Questions

Every unit is assembled and tested in the factory first. On site the sections are joined with the seals, brackets and bolts delivered with the unit, and everything is checked again at commissioning.

Skawen’s service team or the installer, following Skawen’s instructions. When a unit comes fully dismantled, Skawen’s own team builds it, as at Tallinn School No. 21.

About 60–2 000 kg, depending on the size of the unit. The weight of each section is on its rating plate, so lifting gear can be chosen in advance.

Yes. The refrigerant circuit is filled and tested in the factory. If a split goes through the circuit, a certified refrigeration technician connects, evacuates and fills it on site.

The way in: door and corridor widths, stairs and turns, lift cabin and door, roof hatch or shaft, and the floor load. Photos of the route help most.

Narrow Door, Old Lift, Cellar Shaft?

Your building

Send us the measurements or a few photos of the way in. We tell you how the unit will come in before you order.

Send Us Your Way In