Older buildings have narrow doors, steep stairs and small lifts. A Skawen unit can arrive whole, in sections or fully dismantled – and is joined again in your plant room. No walls opened, no crane over the roof.
Built to Get In: Units Delivered in Sections
600 × 2 000 mmsmallest door a Skawen unit has come through so far (Riigikogu, Tallinn)
1.40 × 1.20 mcellar shaft, units lowered 8 m in sections (Gland, Switzerland)
60–2 000 kgweight of one section, depending on the unit
–30 %weight compared with a metal casing
Whole, in Sections or Fully Dismantled
We decide it together with you when the unit is selected – from the drawings, the photos and the measurements of the way in.
01WholeBy crane or forkliftThe unit leaves the factory in one piece and is lifted onto the roof or set into the plant room. The fastest installation when the site has the space.
- New buildings and rooftops
- Factory-tested as one unit
- Ducts and power connected on arrival
02In sectionsThrough doors, lifts and hatchesThe unit is split at its joints into cubes: filters, fans, heat recovery, coils. Each section sits on its own base frame and is carried in one by one.
- Basements, attics and cellar shafts
- Sections of about 60–2 000 kg
- Pushed together and bolted inside
03Fully dismantledWhen even a section is too bigPanels, profiles and components travel separately and the unit is built in the plant room. The composite panels are light enough to carry by hand.
- Openings down to 600 × 2 000 mm
- Listed and historic buildings
- Assembled by Skawen’s service team
From the Factory to Your Plant Room
The same unit, the same factory test – only the way in changes. Watch a four-section unit go through a standard door.
Schematic drawing. Section count and sizes depend on the unit; the same works for stairs, lifts and roof hatches.
Made to Come Apart
Sectional delivery is not an extra. It comes from how every Skawen unit is built.
01Light composite panelsAbout 30 % lighter than a metal casing. Sections can be carried, rolled and lifted with simple gear.
02A base frame under every sectionU-profile of glass-fibre reinforced plastic with lifting holes. Sections are pushed together on it and bolted.
03Joining kit in the boxBrackets, bolts and seal come with the unit. The joints are designed in from the start, not cut on site.
04Every section labelledEach section has its own door and a label showing what is behind it, so the order on site is clear.
05Factory-tested firstThe whole unit is assembled, wired and run in Estonia before it is split for transport.
06Sized for the roomSections and the whole unit are dimensioned to the plant room, shaft or roof you already have.

Old Unit Out, New Unit In – Through the Same Door
In most renovations the old unit was lifted in before the walls were built. The new one does not need a hole in the wall or a crane over the roof.
- No walls opened, no roof reinforced
- The plant room keeps its size – the unit is sized to it
- Sections come in through doors, lifts and hatches
- Pools, schools and offices stay open longer during the works
Measure the way in once
Door and corridor widths · stairs and turns · lift cabin and door · roof hatch or shaft · floor load · photos of the route
Where the Way In Was the Hard Part
Pools, schools, a parliament and a basement spa. In each one the unit came in smaller than it was built.
Parliament building · EstoniaRiigikogu – Estonian Parliament600 × 2 000 mmdoor into the ventilation chamberA listed building in Tallinn’s old town. The only way in was a 600 × 2 000 mm opening, so the SKW Compact 3000 Recu came in parts and was assembled in the plant room.
School and public pool · SwitzerlandCollège des Perrerets, Gland8 m downa 1.40 × 1.20 m cellar shaftTwo pool units came as single cubes, were lowered 8 m down a cellar shaft and joined below. The pool hall stayed as it was.
School pool · EstoniaTallinn School No. 21Fully dismantledassembled inside by SkawenNot even sections fitted into the school, so the SKW 6.3 Pool came fully dismantled and Skawen’s service team built it in the ventilation room.
Hotel pools · LuxembourgChâteau d’UrspeltTwo partsinto an existing technical roomOne SKW2 Pool unit for three pools and a jacuzzi area. It did not fit into the technical room in one piece, so it was built and delivered in two parts.
Private pool and spa · SwitzerlandZollikon private poolIn partscarried into a basementA private pool renovation. The SKW Compact 1000 was taken apart at the factory, carried into the basement and assembled on site.
More projects
- Defence Forces site, Tapa – SKW 7.3 Recu, 12 000 m³/h, 2025. The heat exchanger came in two parts and was assembled on site.
- Viimsi Artium – SKW 5.3 Recu, 6 500 m³/h. A new building with very little plant room: delivered flat-packed and built on site, the coils in a separate casing.
Before You Plan the Delivery
Narrow Door, Old Lift, Cellar Shaft?
Send us the measurements or a few photos of the way in. We tell you how the unit will come in before you order.